Semi Gloss
Studio Look
AREA OF APPLICATION: For best results, newly plastered surface should be painted after two months of curing of plaster or previously painted surface should be sanded to remove loose particles, paint, dust, cracks, or flaked paint, etc.
- Anti Fungal
- Low Dust Pick Up
- Colour Retention
- Low VOC & Low Odour
- Lead-Free & Environment Friendly
| Method of Application | Brush or Roller |
| Area of Application | Cement Plaster, Concrete Store, Brick Asbestor |
| Dilution | Potable Water |
| Drying Time | Surface dry 1Hr |
| Re-coating Period | 4-6 hrs. |
| Spreading | 70-80 sq.ft / ltr / 2 coats |
| Shades Available | White & as per shade card |
| Packaging | 20 Ltr, 10 Ltr, 4 Ltr, & 1 Ltr. |